It is amazing what people can do when they work together. I went over to the site at lunch time last Thursday and in a matter of a few minutes I saw so much of the framing go up. It was all hands on deck but it was still business as usual. There were two or three people on the ground passing up the supplies and many more on the roof and ladders doing the nailing. I came back later that evening and they were completely finished with the second floor exterior wall and roof sheathing. Fast forward to Saturday evening, we went back and the entire first and second floor interior walls had been framed. There were a few pieces of wood that were used for the studs that we didn't like so we talked to the project manager and he did not have a problem with getting those replaced. They weren't load-bearing walls or anything but that doesn't mean it should be ignored. Some progress pics are below.